Implement process control measurement before SMT processing
Time:2021-09-30 Read: 2028

SMT processing is an abbreviation for the process of soldering components on a PCB circuit board through a placement machine and a reflow soldering machine. Whether the components can work normally, whether the final circuit board can guarantee normal work and function depends on this. Therefore, process control measurements must be implemented before SMT processing to optimize PCBA processing and assembly. This will ensure that costly errors will not be discovered in the future, reduce product failure rates, and protect the reputation of SMT chip processing plants.

1-2109151K622518.jpg

 

The process control of PCB assembly mainly involves the implementation of some robust processes in the printing, mounting and reflow stages.


Let us dive into some details of assembly SMT welding defects. The success of solder paste printing determines whether the overall quality can meet expectations. Therefore, we need to understand and evaluate the quality abnormalities that may affect the process in detail.


Before SMT proofing, the following items must be checked:

1. What PCB needs to be tested

1. Whether the PCB light board is deformed and the surface is smooth;

2. Whether there is oxidation on the circuit board pads;

3. Whether the copper coating on the circuit board is exposed;

4. Whether the PCB has been baked for the specified time.


2. What should be checked before solder paste printing

1. The plates cannot be stacked vertically, and no collision between the plates;

2. Whether the positioning hole is consistent with the template opening;

3. Whether the solder paste is thawed in advance at room temperature;

4. Whether the selection of solder paste is correct and whether it has expired;

5. Whether the SPI solder paste detector has calibration data;

6. Whether the steel mesh and mold are cleaned, and whether there is flux residue on the surface;

7. Whether to conduct warpage test on steel mesh;

8. Whether the parameters of the scraper are calibrated and adjusted.

 

1-2109151KF5U8.jpg

 

Shenzhen Leicas Precision Manufacturing and Processing Advantages

1. Highly professional: The company focuses on processing samples, small and medium batches, and promises to deliver goods within 3-5 working days after the materials are confirmed.

2. Professional equipment: The company's equipment is advanced equipment tailored for sample and small and medium batch production, which can be attached to 0201, BGA pitch 0.3MM, QFN, CSP, CON and other components.

3. Professional technology: 100% of technical backbones have more than 5 years of work experience, and 85% of frontline operators have more than 3 years of work experience.

4. The company implements the 5S and 6σ concepts in its daily operations, and has at least 7 checks from incoming materials to shipments. Our company promises to pass AOI optical inspection if the quantity reaches 100PCS.

5. The company promises that the welding through rate is over 99%. If the customer finds welding defects, the company promises to repair it free of charge.


PCBA proofing process

1. Customer orders

Customers place orders according to their actual needs, PCBA processing plants, and put forward specific requirements. The processing plant will evaluate its own capabilities to see if it can complete the order. If the manufacturer determines that it can complete the order within the expected time, then the two parties will negotiate to determine the production details.


2. Customers provide production materials

After the customer decides to place an order, he provides a series of documents and checklists to the PCBA processing plant, such as PCB electronic files, coordinate files, and BOM lists required for production, which are all required.


3. Procurement of raw materials

PCBA processing plants purchase relevant raw materials from designated suppliers according to the documents provided by customers.


4. Incoming Material Inspection

Before PCBA processing, all raw materials to be used are subjected to strict quality inspection to ensure that they are qualified and put into production.


5. PCBA production

During PCBA processing, in order to ensure the quality of production, whether it is patch or solder production, manufacturers need to strictly control the furnace temperature.


6. PCBA test

The PCBA processing plant conducts strict product testing, and the PCB boards that pass the test are delivered to the customer.


7. Packaging after sale

After PCBA processing is completed, the product is packaged and then delivered to the customer to complete the entire PCBA processing work.


Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: ya198.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號(hào)
  • Links:
中文字幕精品无码亚洲字| 亚洲熟妇无码av不卡在线播放| 国产精品亚洲专区无码牛牛| 精品熟女60老妇av免| 亚洲小说春色综合另类| 精品少妇人妻av无码专区偷人| 国产又色又爽又刺激在线观看| 又大又粗又爽免费视频a片| 国产精品久久久久久无码专区| 蜜臀av夜夜澡人人爽人人| 国产特黄a片aaaa毛片| 夹得好湿真拔不出来了动态图| 激情都市亚洲一区二区| 少妇口述与子做过爱| 玩弄丰满少妇高潮a片推油小说| 你的东西太大了我装不了| 色婷婷综合久久久中文字幕| av无码免费岛国动作片| 国产+日韩+另类+视频一区| 婷婷狠狠色18禁久久| 丰满少妇被猛烈高清播放| 青青草原综合久久大伊人精品| 熟女视频一区二区在线观看| 亚洲 国产 另类 无码 日韩| 哈尔滨老熟女啪啪嗷嗷叫| 又大又长粗又爽又黄少妇视频| 性做久久久久久免费观看| 国产va免费精品观看精品| 四虎成人精品永久免费av| 日本少妇又色又爽又高潮| 成码无人AV片在线电影网站| 久久人人爽人人爽人人片av麻烦| 一本一道精品欧美中文字幕| 公翁大龟挺进秀婷小说| 中文字幕精品久久久久人妻| 老师好大好爽我要喷水了视频| 夜鲁鲁鲁夜夜综合视频欧美| 无码国产69精品久久久久APP| 日韩毛片| 国产精品久久人妻无码网站仙踪林| 少妇夹得好紧太爽了a片|